Optimized for Desktop First...
Try making your window wider or switching to desktop mode.
Try making your window wider or switching to desktop mode.
|
||||||||||||||||||||||||
|
Vladimir Legion
KOCMO-LLIKoJIA - Cepn n MoJLom Alea jacta est. |
Ship: | Covetor ( Mining Barge ) |
---|---|
System: | J103339 (C2) (-1.0) / B-R00004 |
Closest: | J103339 III (2.24au) |
Time: | 2024-04-19 19:42 |
Points: | 3 |
Damage: | 9,688 |
Ship+Fit: | 87,742,634.09 ISK |
Dropped: | 14,139,822.89 ISK |
Destroyed: | 83,600,141.88 ISK |
Total: | 97,739,964.77 ISK |
Item(s) Dropped / Destroyed
Item | Qty |
Value |
|
---|---|---|---|
Variegated Asteroid Mining Crystal Type B II | 1 | 1,596,150.00 | |
Modulated Strip Miner II | 1 | 8,014,000.00 | |
Variegated Asteroid Mining Crystal Type B II | 1 | 1,596,150.00 | |
Modulated Strip Miner II | 1 | 8,014,000.00 | |
ML-3 Scoped Survey Scanner | 1 | 1,196.21 | |
Burst Jammer I | 1 | 86,637.61 | |
Warp Core Stabilizer II | 1 | 715,800.00 | |
Mining Laser Upgrade II | 1 | 826,216.67 | |
Mining Laser Upgrade II | 1 | 826,216.67 | |
Medium Low Friction Nozzle Joints I | 3 | 2,074,794.99 | |
Mining Drone II | 2 | 1,641,906.66 | |
Mining Drone II | 3 | 2,462,859.99 | |
Hornet EC-300 | 4 | 27,984.92 | |
Hornet EC-300 | 1 | 6,996.23 | |
Complex Asteroid Mining Crystal Type B I | 4 | 1,327,066.68 | |
Variegated Asteroid Mining Crystal Type B II | 1 | 1,596,150.00 | |
Variegated Asteroid Mining Crystal Type A II | 1 | 517,800.00 | |
Variegated Asteroid Mining Crystal Type A II | 1 | 517,800.00 | |
Gneiss | 1,800 | 6,038,514.00 | |
Covetor | 1 |
59,851,724.14 |
Insurance Possible payouts
Type | Cost | Payout |
---|---|---|
None | 0.00 | 12,714,651.00 |
Basic | 1,589,331.00 | 15,893,315.00 |
Standard | 3,178,663.00 | 19,071,977.00 |
Bronze | 4,767,994.00 | 22,250,640.00 |
Silver | 6,357,326.00 | 25,429,303.00 |
Gold | 7,946,657.00 | 28,607,966.00 |
Platinum | 9,535,989.00 | 31,786,629.00 |